Version 2.6
Term | Term Definition | Options | Unit of Measure |
---|---|---|---|
Condition |
Description of a component's condition. |
View | None |
Conditioned | Premises are conditioned if mechanically cooled, heated, ventilated, and/or controlled for humidity. | View | None |
Conditioned | Premises are conditioned if mechanically cooled, heated, ventilated, and/or controlled for humidity. | View | None |
Conditioned | Premises are conditioned if mechanically cooled, heated, ventilated, and/or controlled for humidity. | View | None |
Conditioning Status |
A description of the state of "conditioning" of a premises or space, where conditioning is primarily concerned with heating, cooling and ventilation. |
View | None |
Conducted | Blower door test conducted by unknown method. | View | None |
Conference | A Telephone without a handset that utilizes a speakerphone for all communications and is primarily used for conference calls. | View | None |
Conference room | A conference room is a room provided for an event such as a conference and meeting. They might exist at large hotels, arenas, convention centers, and hospitals. | View | None |
Confirmed | The accuracy of this data was confirmed by an appropriate entity. | View | None |
Confirmed By |
Entity that confirmed the accuracy of the data. |
View | None |
Connected load | Power load capacity of equipment in the premises, such as total kW of a server farm. | View | None |
Connections sealed with mastic | View | None | |
Constant volume | View | None | |
Constant volume | View | None | |
Construction | Construction | View | None |
Construction administration | Construction proceeds based on the detailed construction plan. Addendums and modifications are developed as on-site challenges arise and are mitigated. Building systems are commissioned in preparation for occupancy. Energy analysis can be used to assist commissioning and evaluate potential mitigation alternatives. | View | None |
Construction documents | Mechanical, electrical, plumbing, fire protection and other building systems are integrated into the architectural framework. Specifications for the performance, durability, and ÒqualityÓ of all construction materials and equipment are written. Detailed drawings for all site and building elements including systems are developed in preparation for construction bids. Detailed energy analysis is used to finalize the mechanical system configuration, equipment sizing and controls, and to calculate predicted building energy intensity for code compliance and certification purposes. | View | None |
Construction layer | The material used in a construction layer, that is not Framing or Insulation | View | None |
Construction Method |
The general description of the main structural construction method used for an Opaque Surface. |
View | None |
Construction Status |
Indicates whether the premises is in design or in existing operation. |
View | None |
Construction Status Date |
Date when the construction status first applied. |
View | YYYY-MM-DD |
Consumption Rate |
Rate at which resource is consumed by the system. |
View | Unknown |
Consumption Rate Type |
Rate measurement type for resource consumption of the system. |
View | None |
Contact | Generic contact | View | None |
Contact ID |
Identification number associated with the contact. |
View | None |