Version 2.6
Term | Term Definition | Options | Unit of Measure |
---|---|---|---|
Core | Located within the inner core zone of a building | View | None |
Core | Located within the inner core zone of a building | View | None |
Corner | Commonly used street suffix or abbreviations: Cor | View | None |
Corner | Commonly used street suffix or abbreviations: Cor | View | None |
Corner Of |
A directional word describing a corner formed by the intersection of two thoroughfares. For example "Northwest corner of Scott Street and North Walnut Street, Stillwater, OK" has "Northwest" as the Corner Of. Refer to Cardinal Direction for constrained list. |
View | None |
Corners | Commonly used street suffix or abbreviations: Cors | View | None |
Corners | Commonly used street suffix or abbreviations: Cors | View | None |
Corporation partnership LLC | View | None | |
Corrected | The application data has been corrected. | View | None |
Correlated color temperature of a light source | Correlated Color Temperature of a Light Source (CCT) is the absolute temperature of a blackbody whose chromaticity most nearly resembles that of the light source. | View | None |
Corridor | A corridor is a long passage in a building from which doors lead into rooms. | View | None |
Corridor | View | None | |
Cost |
Cost to related the project or measure. May be associated with "Cost Attribution" and "Interval Period", if necessary. |
View | $ |
Cost | Generic cost | View | None |
Cost Attribution |
Type of Costs to implement or maintain the project or measure. This may include several different costs. |
View | None |
Cost Effectiveness Screening Method |
Method for calculating cost-effectiveness for measures or project |
View | None |
Cost Effectiveness Value |
Metric for evaluating the cost-effectiveness of measures or project |
View | Unknown |
Cost Intensity |
Cost per square foot of affected space. |
View | $/ft2 |
Cost Period |
Length of study period: The study period begins with the base date, the date to which all cash flows are discounted. The study period includes any planning/construction/implementation period and the service or occupancy period. The study period has to be the same for all alternatives considered. |
View | days |
Cost Savings |
Cost savings associated with a measure or project. This term can also further explained by using a relevant entry from the term Interval Frequency. |
View | $ |
Cost Savings Intensity |
Cost savings associated with a measure or project divided by the floor area affected. |
View | $/ft2 |
count | number of items | View | None |
count/ft2 | number of items per square foot | View | None |
count/m2 | number of items per square meter | View | None |
Counter top | Available in both caster-equipped floor models and more compact countertop styles. | View | None |