Version 2.6
Term | Term Definition | Options | Unit of Measure |
---|---|---|---|
Salamander broiler | Salamander broiler, or cheesemelter, is a type of overfired broiler intended for a limited set of tasks, including browning food or melting cheese. | View | None |
Sand | Sand storage includes sand particles as the heat collector, heat transfer and thermal energy storage media. | View | None |
Satellite | A STB or DVG that can receive and decode video content as delivered from a MVPD satellite network. | View | None |
Saturday | Saturday is the day of the week following Friday and preceding Sunday, and (together with Sunday) forming part of the weekend. | View | None |
Savings Attribution |
Type of savings associated with a measure or project. Complete constrained list options include constrained lists from Energy Resource and Water Resource. |
View | None |
Savings to investment ratio | SIR is a dimensionless measure of performance that expresses the ratio of savings to costs where the numerator of the ratio contains the operation-related savings and the denominator contains the increase in investment-related costs | View | None |
SC | South Carolina | View | None |
SC | South Carolina | View | None |
Scanner | Converts paper originals into electronic images that can be stored, edited, converted, or transmitted, primarily in a personal computing environment. | View | None |
Schedule | Power is supplied according to an associated schedule | View | None |
Schedule | View | None | |
Schedule Category |
The category this schedule applies to. |
View | None |
Schedule Day |
Day(s) this schedule applies to. |
View | None |
Schedule Period |
The period label for the schedule. |
View | None |
Schedule Period Begin Day |
The day when this schedule period takes effect. |
View | DD |
Schedule Period Begin Month |
The month when this schedule period takes effect. |
View | MM |
Schedule Period End Day |
The day when this schedule period ends. |
View | DD |
Schedule Period End Month |
The month when this schedule period ends. |
View | MM |
Scheduled | View | None | |
Schematic design | Conceptual design is refined to illustrate scales and relationships between project components. Preliminary drawings for the site, building plan, elevations, and interior sections are developed to establish design intent. Project execution roadmap is developed, which includes budget, early challenges and opportunities and mitigating strategies. Comparative, early stage energy and loads analysis is used to identify relevant energy-efficiency measures and inform the design. | View | None |
Scope |
Percentage of the premises affected by the measure that's either proposed, implemented or evaluated |
View | percent |
Score | Numeric score, either an absolute number or number within a range such as 1-100 | View | None |
Screen | A shading system that is generally made of some sort of mesh or woven material. | View | None |
Screw | A positive displacement rotary compressor that produces compression with two intermeshing helical rotors. A compressor that is a component of a vapor-compression refrigerating machine and is used to draw the refrigerant vapor from the evaporator and deliver it to the condenser. | View | None |
Screw | A positive displacement rotary compressor that produces compression with two intermeshing helical rotors. A compressor that is a component of a vapor-compression refrigerating machine and is used to draw the refrigerant vapor from the evaporator and deliver it to the condenser. | View | None |