BEDES Dictionary

Version 2.6

You can explore the BEDES dictionary in several ways: use the search box to search for a particular term; filter the list of terms by category using the checkboxes below; click on each term for more details. You can also download all the terms and list options in CSV or XML format using the buttons below.

All Terms:
BEDES TERMS CSV [version]BEDES TERMS XML [version]
All List Options:
BEDES LIST OPTIONS CSV [version]BEDES LIST OPTIONS XML [version]
 
Filter By Category
Global Terms
Termsort descending Term Definition Lists Unit of Measure
Width

The dimension of an object from one side to the other. This can be used to define the width of any building component, such as the width of a photovoltaic panel or a window. In relation to length, width can be the dimension perpendicular to the length.

ft
Year of Manufacture

Year the product was produced and labeled by the manufacturer.

YYYY
Zoning System Type

Type of HVAC, Lighting, Sensor, or other zoning schemes

View None
Measures
Termsort descending Term Definition Lists Unit of Measure
Action Category

Type of activity associated with a project.

View None
Application Scale

Scale at which the project or measure is applied, such as an individual system, multiple systems, or entire facility

View None
ASHRAE Audit Level

Energy audit level as defined in ASHRAE Procedures for Commercial Building Energy Audits

View None
Audit Exemption

Conditions under which the building is exempt from a mandated audit.

None
Benchmark Status View None
Capitalization Rate

The capitalization rate is the rate of return on a real estate investment property based on the income that the property is expected to generate.

percent
Charged Off Reason

The basis for charging off a loan.

View None
Compliance Status

Status of compliance for ordinances requiring benchmarking or audit.

View None
Compliance Status Date

Date when the associated compliance status changed.

YYYY-MM-DD
Contracting Method

Contracting method for financing capital improvements, which allows cost reductions to fund energy upgrades.

View None
Cost

Cost to related the project or measure. May be associated with "Cost Attribution" and "Interval Period", if necessary.

$
Cost Attribution

Type of Costs to implement or maintain the project or measure. This may include several different costs.

View None
Cost Effectiveness Screening Method

Method for calculating cost-effectiveness for measures or project

View None
Cost Effectiveness Value

Metric for evaluating the cost-effectiveness of measures or project

Unknown
Cost Intensity

Cost per square foot of affected space.

$/ft2
Cost Period

Length of study period: The study period begins with the base date, the date to which all cash flows are discounted. The study period includes any planning/construction/implementation period and the service or occupancy period. The study period has to be the same for all alternatives considered.

days
Cost Savings

Cost savings associated with a measure or project. This term can also further explained by using a relevant entry from the term Interval Frequency.

$
Cost Savings Intensity

Cost savings associated with a measure or project divided by the floor area affected.

$/ft2
Debt Obligation

Total of all debt obligations for the borrower(s), including housing-related and non-housing-related debt. Use Interval Frequency to qualify (e.g., Annual, Month, etc.)

$
Discard Reason

Reason why the proposed mesure was dicarded.

View None
Discount Factor

Discount factor applied to calculate present values of future cash flows

None
Emissions Savings Intensity Unknown

Pages