Type of activity associated with a project.
Data Type:
Constrained List
Category:
Unit of Measure:
None
Sector:
Commercial, Residential, Multifamily
Type of activity associated with a project.
List Options | Option Definition | Unit of Measure | |
---|---|---|---|
Addition | New addition of space, system, or equipment to existing premises | None | |
Audit | An audit is an assessment of the energy needs and efficiency of a premises. | None | |
Behavioral intervention | A behavioral intervention refers to the education, training, or motivating activity that engages occupants of a premises in an effort to modify their behavior to reduce energy consumption. | None | |
Commissioning | Building commissioning (Cx) is the process of verifying, in new construction, all (or some, depending on scope) of the subsystems for mechanical (HVAC), plumbing, electrical, fire/life safety, building envelopes, interior systems (example laboratory units), cogeneration, utility plants, sustainable systems, lighting, wastewater, controls, and building security to achieve the owner's project requirements as intended by the building owner and as designed by the building architects and engineers. | None | |
Construction | Construction | None | |
ECM | Energy conservation measure | None | |
Major remodel | Substantial modification of space or system in existing premises | None | |
Measure | Defined modification of equipment, system, or operation | None | |
Modification | Modification of existing equipment or system | None | |
Monitoring | Monitoring | None | |
MV | Measurement and verification | None | |
None | None | None | |
Not applicable | Not applicable | None | |
Other | Other | None | |
Program | Authorized or supported program such as rebate | None | |
Project | None | ||
Removal | Removal of space, system, or equipment in existing premises | None | |
Replacement | Individual replacement of equipment | None | |
Retrocommissioning | Retrocommissioning is a process that seeks to improve how building equipment and systems function together. | None | |
Retrofit | Modification of system or equipment possibly including replacement, addition, and/or adjustment | None | |
Test | Individual test of equipment or system | None | |
Training | Training | None | |
Tune up | Building or system tune-up | None | |
Unknown | Unknown | None |
CSV or XML files containing information such as definition, unique ID, and URL for each BEDES Term or List Option can be downloaded by clicking the appropriate orange button. The downloaded file can then be processed offline. Note that the XML documents are simply a "flat file" of terms, not a structured schema.