BEDES Dictionary
Version 2.6
You can explore the BEDES dictionary in several ways: use the search box to search for a particular term; filter the list of terms by category using the checkboxes below; click on each term for more details. You can also download all the terms and list options in CSV or XML format using the buttons below.
Term | Term Definition | Lists | Unit of Measure | |
---|---|---|---|---|
Uninterruptible Power Supply Type |
Uninterruptible Power Supply (UPS) is a combination of converters, switches, and energy storage devices (such as batteries) constituting a power system for maintaining continuity of load power in case of input power failure. |
View | None | |
UPS Input Dependency Characteristics |
The input dependency characteristics of a uninterruptible power supply (UPS). |
View | None | |
UPS Power Conversion |
The type of UPS power conversion. |
View | None | |
UPS Power Output |
The type of power output, such as AC or DC, for a UPS. |
View | None | |
UPS Support |
Load supported by the UPS. |
View | None | |
Water Cooler Source |
The water source of a particular water cooler. |
View | None | |
Water Cooler Storage |
The type of water storage of a water cooler. |
View | None | |
Water Cooler Unit |
A freestanding device that consumes energy to cool and/or heat potable water. |
View | None | |
Water Feature Heating Method |
Water feature heating methods. |
View | None | |
Water Feature Type |
Type of water feature |
View | None |
Term | Term Definition | Lists | Unit of Measure | |
---|---|---|---|---|
Average Annual Hours |
Number of hours in a typical year. |
hr/year | ||
Average Annual Weeks |
The number of weeks that the premises or equipment is in use. For example, a pool premises may only be open for 16 weeks out of the year. |
weeks/year | ||
Average Daily Hours |
If exact start and end hours are unknown, then the total number of hours per day. |
hr/day | ||
Average Weekly Hours |
Number of hours in a typical week. |
hr/week | ||
Control Communication Protocol |
Standards for control communication protocols. |
View | None | |
Control Strategy |
Control logic or strategy that is programed into the system. |
View | None | |
Control Technology |
Technological device that enables control of the system. |
View | None | |
Date Of Most Recent Maintenance Event |
The date of the most recent maintenance that was performed on the premises or equipment. |
YYYY-MM-DD | ||
Day End Time |
In military time (0000 start of day). If the end hour is the next day, then this day ends at 2400 and the next starts at 0000 and ends at closing time. For example, a nightclub may be open from 8PM Friday to 2AM Saturday, then on Friday: Day Start Time is 2000 and Day End Time is 2400, and on Saturday: Dat Start Time is 0000 and Day End Hour is 0200. |
hh:mm | ||
Day Start Time |
In military time (0000 start of day). If the night before the schedule runs into this day, then start time is 0000, while yesterday's end time is 2400. For example, a nightclub may be open from 8PM Friday to 2AM Saturday, then on Friday: Day Start Time is 2000 and Day End Time is 2400, and on Saturday: Dat Start Time is 0000 and Day End Hour is 0200. |
hh:mm | ||
EMIS Feature |
Features of an Energy Management and Information System |
View | None | |
Frequency Of Maintenance |
Frequency of maintenance on the premises or equipment. |
View | None | |
HVAC Systems Controlled |
HVAC system that are monitored by this control. |
View | None | |
Laundry Load Type |
Type of materials laundered. |
View | None | |
Maintenance Events Per Year |
The number of maintenance events performed on the premises or equipment in the time period. |
count |