Version 2.6
Term | Term Definition | Options | Unit of Measure |
---|---|---|---|
FICO Score |
The "classic" or "generic" FICO (Fair Isaac Corporation) credit score of the borrower, as measured by one of the three national credit bureaus (Experian, Equifax, and Trans Union). |
View | None |
Fidelity Index | Rf - Analogous to CIE Ra (CRI). Characterizes the average color shift of the 99 CES to characterize the overall level of similarity between the test source and reference illuminant. Values range from 0 to 100. | View | None |
Field | Commonly used street suffix or abbreviations: Fld | View | None |
Field | Commonly used street suffix or abbreviations: Fld | View | None |
Field angle | The angle between the two directions for which the intensity is 10% of the maximum intensity as measured in a plane through the nominal beam centerline. (ANSI/IES RP-16-10) | View | None |
Fields | Commonly used street suffix or abbreviations: Flds | View | None |
Fields | Commonly used street suffix or abbreviations: Flds | View | None |
Fill factor | The fill factor is the ratio of the actual maximum attainable power to the product of the open circuit voltage and short circuit current. | View | None |
Filter | View | None | |
Fin | A vertical element of a premises that projects perpendicularly from the face of a premises. | View | None |
Final stage | The final assessment or application approval stage. | View | None |
Financial office | View | None | |
Financier | Contact information for the financier | View | None |
Financing | The cost of financing for projects or measures that are funded over time through loans or alternative financing mechanisms | View | None |
Finish |
The final material applied to a surface, either interior or exterior. Some structural components don't have an exterior finish, such as unfinished poured concrete |
View | None |
Finished | To be considered finished, the premises must meet three of the following criteria: be heated, have finished walls, have a finished ceiling (no exposed floor joists), and have a finished floor (painted concrete floors don't count). | View | None |
Finished Status |
The condition of the premises relative to the amount of work that has been done to the components and surfaces. |
View | None |
Fire Hazard Severity Zone |
Fire hazard severity zone rating |
View | None |
Fire station | View | None | |
Fireplace | View | None | |
Fireplace | View | None | |
First cost | First or initial cost | View | None |
First out | Under a Ôfirst outÕ contract the contractor is paid 100% of the energy savings until the project costs Ð including the contractor's profit Ð are fully paid. The exact duration of the contract will actually depend on the level of savings achieved: the greater the savings, the shorter the contract. | View | None |
Fitness center health club gym | View | None | |
Fitting | Specially manufactured fittings for different types of plumbing installations that penetrate surfaces. | View | None |