Version 2.6

Term Term Definition Options Unit of Measure
FICO Score

The "classic" or "generic" FICO (Fair Isaac Corporation) credit score of the borrower, as measured by one of the three national credit bureaus (Experian, Equifax, and Trans Union).

View None
Fidelity Index Rf - Analogous to CIE Ra (CRI). Characterizes the average color shift of the 99 CES to characterize the overall level of similarity between the test source and reference illuminant. Values range from 0 to 100. View None
Field Commonly used street suffix or abbreviations: Fld View None
Field Commonly used street suffix or abbreviations: Fld View None
Field angle The angle between the two directions for which the intensity is 10% of the maximum intensity as measured in a plane through the nominal beam centerline. (ANSI/IES RP-16-10) View None
Fields Commonly used street suffix or abbreviations: Flds View None
Fields Commonly used street suffix or abbreviations: Flds View None
Fill factor The fill factor is the ratio of the actual maximum attainable power to the product of the open circuit voltage and short circuit current. View None
Filter View None
Fin A vertical element of a premises that projects perpendicularly from the face of a premises. View None
Final stage The final assessment or application approval stage. View None
Financial office View None
Financier Contact information for the financier View None
Financing The cost of financing for projects or measures that are funded over time through loans or alternative financing mechanisms View None
Finish

The final material applied to a surface, either interior or exterior. Some structural components don't have an exterior finish, such as unfinished poured concrete

View None
Finished To be considered finished, the premises must meet three of the following criteria: be heated, have finished walls, have a finished ceiling (no exposed floor joists), and have a finished floor (painted concrete floors don't count). View None
Finished Status

The condition of the premises relative to the amount of work that has been done to the components and surfaces.

View None
Fire Hazard Severity Zone

Fire hazard severity zone rating

View None
Fire station View None
Fireplace View None
Fireplace View None
First cost First or initial cost View None
First out Under a Ôfirst outÕ contract the contractor is paid 100% of the energy savings until the project costs Ð including the contractor's profit Ð are fully paid. The exact duration of the contract will actually depend on the level of savings achieved: the greater the savings, the shorter the contract. View None
Fitness center health club gym View None
Fitting Specially manufactured fittings for different types of plumbing installations that penetrate surfaces. View None

Pages

Subscribe to Version 2.6