Version 2.6

Term Term Definition Options Unit of Measure
Regular soil Common soil View None
Regulated medical waste Regulated medical waste View None
Reheat Reheat control strategy. Use additional qualifiers (e.g., dual maximum logic) to clarify View None
Reheat Source

Energy source used to provide reheat energy at a terminal unit.

View None
Rejected Submitted assessment has been rejected View None
Relative humidity Relative humidity can be expressed by partial vapor and air pressure, density of the vapor and air, or by the actual mass of the vapor and air. View None
Religious organization Occupants are members of a religion-supporting organization. View None
Religious organization View None
Religious worship View None
Remote condensing unit A Remote condensing unit (RCU) or split system unit is a model in which the ice-making mechanism and condenser or condensing unit are in separate sections. View None
Removal Removal of space, system, or equipment in existing premises View None
Renewable Resource is generated using renewable technology View None
Renewable energy credits Savings due to sale of Renewable Energy Certificates (RECs), also known as Green tags, Renewable Energy Credits, Renewable Electricity Certificates, or Tradable Renewable Certificates (TRCs). RECs are tradable, non-tangible energy commodities in the United States that represent proof that 1 megawatt-hour (MWh) of electricity was generated from an eligible renewable energy resource (renewable electricity). View None
Renewable Energy Credits (RECs) Retained

Percentage of Renewable Energy Credits (RECs) that were kept compared to the total quantity of RECs that is associated with the total amount of renewable energy that was generated.

View percent
Renewable energy systems View None
Rentable Floor area that is being rented or is for rent. View None
Rental The premises is available for or being rented. View None
Rented Premises are rented/leased to a tenant other than the owner View None
Repair View None
Repair and replacement Savings due to reduction of repair, and replacement activities by existing staff. This allows staff to focus on other activities. The planned expenditures for repair parts and materials are annually recurring energy-related cost savings that can support contractor payments, but there are no personnel cost savings because the agency siteÕs staffing level remains the same View None
Repair services View None
Replace View None
Replacement Individual replacement of equipment View None
Replacement Cost for replacing the equipment View None
Report Name

Name of the report.

View None

Pages

Subscribe to Version 2.6