Type of Costs to implement or maintain the project or measure. This may include several different costs.
Data Type:
Constrained List
Category:
Unit of Measure:
None
Sector:
Commercial, Residential, Multifamily
Type of Costs to implement or maintain the project or measure. This may include several different costs.
List Options | Option Definition | Unit of Measure | |
---|---|---|---|
Unknown | Unknown | None | |
Unit | Cost per unit, where unit can be Spatial Unit Type, Resource, other | None | |
Total | Total costs to implement the measure or project | None | |
Taxes | Taxes incurred as part of implementing the measure or a project | None | |
System | Cost associated with a system | None | |
Replacement | Cost for replacing the equipment | None | |
Recurring | None | ||
Profit | Profit incurred by the project as part of implementing the measure or project. ESPC projects specify that ESCO's disclose that information as part of the itemized costs. | None | |
Principal repayment | Principal repaid periodically as part of debt service payment | None | |
Permits and licenses | None | ||
Other | Other | None | |
Operating | Costs incurred to operate the piece of equipment installed as part of the measure or project | None | |
Not applicable | Not applicable | None | |
None | None | None | |
Net | Net cost | None | |
MV | Measurement and verification costs are costs to evaluate the performance of a project or a measure | None | |
Material | Costs of material needed to implement the measure or project | None | |
Markup | Generally applied to energy or construction projects procured by the Federal government. The mark-up, usually a set percentage of the project implementation cost, is added to the project price to cover non-project-specific overheads such as general administration and marketing. | None | |
Margin | A different manifestation of markup, to cover non-project specific overheads | None | |
Management and administration | Costs for managing and administrating the implementation of the project | None | |
Maintenance | Costs to maintain the equipment that has been installed as part of the measure or a project | None | |
Labor | Costs of labor to implement the measure or project | None | |
Interest payment | Interest payment incurred periodically as part of debt service payment | None | |
Insurance | Costs for insuring the equipment or system | None | |
Installation | Cost of installation activity | None | |
Incremental | Incremental cost | None | |
Implementation | Cost of implementation activity | None | |
Health and safety | Cost associated with health and safety measures | None | |
Gross | Gross cost | None | |
General | None | ||
Fixed | Costs that remains more or less unchanged irrespective of the size of the measure or a project | None | |
First cost | First or initial cost | None | |
Financing | The cost of financing for projects or measures that are funded over time through loans or alternative financing mechanisms | None | |
Disposal and salvage costs | The net cost of disposing material or equipment that is being replaced or removed. In some cases the salvage value may exceed disposal costs, resulting in a negative value. | None | |
Cost | Generic cost | None | |
Commissioning | Commissioning costs are costs to ensure that the installed measure or project is performing as per the design intent. | None | |
Capital | Capital cost of the measure at the end of its useful life, in current year dollars. | None | |
Before taxes | Cost without taxes | None | |
Advertising | Cost associated with advertising | None |
CSV or XML files containing information such as definition, unique ID, and URL for each BEDES Term or List Option can be downloaded by clicking the appropriate orange button. The downloaded file can then be processed offline. Note that the XML documents are simply a "flat file" of terms, not a structured schema.