Type of Costs to implement or maintain the project or measure. This may include several different costs.
Data Type:
Constrained List
Category:
Unit of Measure:
None
Sector:
Commercial, Residential, Multifamily
Type of Costs to implement or maintain the project or measure. This may include several different costs.
List Options | Option Definition | Unit of Measure | |
---|---|---|---|
Total | Total costs to implement the measure or project | None | |
Installation | Cost of installation activity | None | |
Recurring | None | ||
Implementation | Cost of implementation activity | None | |
Material | Costs of material needed to implement the measure or project | None | |
Health and safety | Cost associated with health and safety measures | None | |
General | None | ||
System | Cost associated with a system | None | |
Labor | Costs of labor to implement the measure or project | None | |
Advertising | Cost associated with advertising | None | |
Before taxes | Cost without taxes | None | |
Permits and licenses | None | ||
Unit | Cost per unit, where unit can be Spatial Unit Type, Resource, other | None | |
Taxes | Taxes incurred as part of implementing the measure or a project | None | |
Gross | Gross cost | None | |
Maintenance | Costs to maintain the equipment that has been installed as part of the measure or a project | None | |
Net | Net cost | None | |
First cost | First or initial cost | None | |
Principal repayment | Principal repaid periodically as part of debt service payment | None | |
Incremental | Incremental cost | None | |
MV | Measurement and verification costs are costs to evaluate the performance of a project or a measure | None | |
Interest payment | Interest payment incurred periodically as part of debt service payment | None | |
Cost | Generic cost | None | |
Commissioning | Commissioning costs are costs to ensure that the installed measure or project is performing as per the design intent. | None | |
Replacement | Cost for replacing the equipment | None | |
Other | Other | None | |
Fixed | Costs that remains more or less unchanged irrespective of the size of the measure or a project | None | |
Management and administration | Costs for managing and administrating the implementation of the project | None | |
Unknown | Unknown | None | |
Capital | Capital cost of the measure at the end of its useful life, in current year dollars. | None | |
Insurance | Costs for insuring the equipment or system | None | |
None | None | None | |
Disposal and salvage costs | The net cost of disposing material or equipment that is being replaced or removed. In some cases the salvage value may exceed disposal costs, resulting in a negative value. | None | |
Markup | Generally applied to energy or construction projects procured by the Federal government. The mark-up, usually a set percentage of the project implementation cost, is added to the project price to cover non-project-specific overheads such as general administration and marketing. | None | |
Not applicable | Not applicable | None | |
Financing | The cost of financing for projects or measures that are funded over time through loans or alternative financing mechanisms | None | |
Margin | A different manifestation of markup, to cover non-project specific overheads | None | |
Operating | Costs incurred to operate the piece of equipment installed as part of the measure or project | None | |
Profit | Profit incurred by the project as part of implementing the measure or project. ESPC projects specify that ESCO's disclose that information as part of the itemized costs. | None |
CSV or XML files containing information such as definition, unique ID, and URL for each BEDES Term or List Option can be downloaded by clicking the appropriate orange button. The downloaded file can then be processed offline. Note that the XML documents are simply a "flat file" of terms, not a structured schema.