Type of Costs to implement or maintain the project or measure. This may include several different costs.
Data Type:
Constrained List
Category:
Unit of Measure:
None
Sector:
Commercial, Residential, Multifamily
Type of Costs to implement or maintain the project or measure. This may include several different costs.
List Options | Option Definition | Unit of Measure | |
---|---|---|---|
Recurring | None | ||
General | None | ||
Permits and licenses | None | ||
Margin | A different manifestation of markup, to cover non-project specific overheads | None | |
Capital | Capital cost of the measure at the end of its useful life, in current year dollars. | None | |
Commissioning | Commissioning costs are costs to ensure that the installed measure or project is performing as per the design intent. | None | |
System | Cost associated with a system | None | |
Advertising | Cost associated with advertising | None | |
Health and safety | Cost associated with health and safety measures | None | |
Replacement | Cost for replacing the equipment | None | |
Implementation | Cost of implementation activity | None | |
Installation | Cost of installation activity | None | |
Unit | Cost per unit, where unit can be Spatial Unit Type, Resource, other | None | |
Before taxes | Cost without taxes | None | |
Insurance | Costs for insuring the equipment or system | None | |
Management and administration | Costs for managing and administrating the implementation of the project | None | |
Operating | Costs incurred to operate the piece of equipment installed as part of the measure or project | None | |
Labor | Costs of labor to implement the measure or project | None | |
Material | Costs of material needed to implement the measure or project | None | |
Fixed | Costs that remains more or less unchanged irrespective of the size of the measure or a project | None | |
Maintenance | Costs to maintain the equipment that has been installed as part of the measure or a project | None | |
First cost | First or initial cost | None | |
Markup | Generally applied to energy or construction projects procured by the Federal government. The mark-up, usually a set percentage of the project implementation cost, is added to the project price to cover non-project-specific overheads such as general administration and marketing. | None | |
Cost | Generic cost | None | |
Gross | Gross cost | None | |
Incremental | Incremental cost | None | |
Interest payment | Interest payment incurred periodically as part of debt service payment | None | |
MV | Measurement and verification costs are costs to evaluate the performance of a project or a measure | None | |
Net | Net cost | None | |
None | None | None | |
Not applicable | Not applicable | None | |
Other | Other | None | |
Principal repayment | Principal repaid periodically as part of debt service payment | None | |
Profit | Profit incurred by the project as part of implementing the measure or project. ESPC projects specify that ESCO's disclose that information as part of the itemized costs. | None | |
Taxes | Taxes incurred as part of implementing the measure or a project | None | |
Financing | The cost of financing for projects or measures that are funded over time through loans or alternative financing mechanisms | None | |
Disposal and salvage costs | The net cost of disposing material or equipment that is being replaced or removed. In some cases the salvage value may exceed disposal costs, resulting in a negative value. | None | |
Total | Total costs to implement the measure or project | None | |
Unknown | Unknown | None |
CSV or XML files containing information such as definition, unique ID, and URL for each BEDES Term or List Option can be downloaded by clicking the appropriate orange button. The downloaded file can then be processed offline. Note that the XML documents are simply a "flat file" of terms, not a structured schema.